wind project mirovtsi
Mirovtsi, Shumen region
POTENTIAL CAPACITY
190-200mw*
*all calculations are made with Wind turbine Siemens Gamesa SG170 (hub height 165m)
PROJECT DEVELOPMENT DETAILS
The project’s location is outside protected areas and Natura 2000
- Spring migration 2009 carried by Bulgarian Society of Bird protection
- Autumn migration 2009 carried by Bulgarian Society of Bird protection
- Report by the Bulgarian Society of Bird protection regarding the bird migration in the area
- Additional field observation done by international experts by RSK Carter Ecological and Turnstone Ecology
- Field observations have been conducted on bird migration routes, nesting birds and habitats for autumn migration 2010, “Nesting birds” and “Wintering birds”
- Report by the RSK Carter Ecological and Turnstone Ecology about the bird migration in the area
- Bat observation was concluded simultaneously with Autumn migration at several
observation points, including transects - Report on behalf of the BG BIOMASS Ltd has been carried out and submitted to the authorities
- Good wind conditions
- Available road and port access
- The project’s location is outside protected areas and Natura 2000
- Detailed and verified long-term bird and bat observations
- Provided land rights for 31 plots
- Long-term relationship with local authorities
31 land plots
WTG – SG170 (165m)
- Estimated Annual Energy Production – 772.000 MWh
- Full Load Hours – 3615 h/year
- Mean Wind Speed – 8.1 m/s
- EPC – EUR 157M
- LCOE – 21.38 EUR/MWh
The project for Wind power plant Mirovtsi has very good wind conditions and availability for grid connection, easy road and port access, as well as the necessary land rights.